VMware 2V0-31.24 Question Answer
An administrator configures a lease policy with the following settings:
• Maximum lease (days): 10
• Maximum total lease (days): 30
• Grace period (days): 5
If a user does not respond to any emails, after how many days will the deployment be destroyed?
VMware 2V0-31.24 Summary
- Vendor: VMware
- Product: 2V0-31.24
- Update on: Jul 21, 2025
- Questions: 59