Cisco 300-425 Question Answer
A network engineer must design a new wireless solution for a company, but the budget can only stretch to include a single Cisco 9800-40
WLC. The company requires high availability between the WLC and the core switch in the event of a cable failure. The WLC must dynamically manage port redundancy and perform load balancing between APs transparently. Which design approach must the engineer take to meet the requirements?
Cisco 300-425 Summary
- Vendor: Cisco
- Product: 300-425
- Update on: Jan 28, 2026
- Questions: 286

