Pre-Summer Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmasmnth

Refer to the exhibit.

Refer to the exhibit.

A client configures an upgrade of its Cisco Nexus switches that are connected to the Cisco ACI controller, such that the switches are upgraded one at a time. After the upgrade is run, it is discovered that both Cisco Nexus switches were upgraded simultaneously. Which two actions ensure that the switches upgrade one at a time? (Choose two.)

A.

Configure the *Do not pause on failure and do not wait on cluster health " Run Mode

B.

Choose the ' Pause upon upgrade failure " Run Mode

C.

Select the " Graceful Maintenance " checkbox

D.

Place each leaf switch in a different upgrade group

E.

Check the Ignore Compatibility " checkbox

Cisco 300-615 Summary

  • Vendor: Cisco
  • Product: 300-615
  • Update on: May 24, 2026
  • Questions: 221
Price: $52.5  $149.99
Buy Now 300-615 PDF + Testing Engine Pack

Payments We Accept

Your purchase with ExamsVCE is safe and fast. Your products will be available for immediate download after your payment has been received.
The ExamsVCE website is protected by 256-bit SSL from McAfee, the leader in online security.

examsvce payment method