Summer Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmasmnth

A federated model has been created for a multidisciplinary project, but clashes are being reported...

A federated model has been created for a multidisciplinary project, but clashes are being reported in areas where coordination should already be resolved. Upon investigation, the BIM manager finds that some models were exported with outdated links and local coordinates.

What is the most appropriate next step before proceeding with coordination analysis?

A.

Instruct teams to verify model references and coordinate systems before reassembly.

B.

Freeze the current model state and ask trades to work around the identified issues.

C.

Notify the client and exclude the faulty models from further coordination.

D.

Run an additional clash-detection pass with adjusted tolerance thresholds to reduce clash totals.

Autodesk BIM_MGT_101 Summary

  • Vendor: Autodesk
  • Product: BIM_MGT_101
  • Update on: Aug 26, 2026
  • Questions: 57
Price: $52.5  $149.99
Buy Now BIM_MGT_101 PDF + Testing Engine Pack

Payments We Accept

Your purchase with ExamsVCE is safe and fast. Your products will be available for immediate download after your payment has been received.
The ExamsVCE website is protected by 256-bit SSL from McAfee, the leader in online security.

examsvce payment method