Autodesk BIM_MGT_101 Question Answer
A firm-wide Revit template has an advanced setup of views preset on sheets. A renovation project has a linked as-built model with levels that do not align with levels from the model template.
What method should a BIM manager use to update the levels and create grids in sync with the resource model, without requiring extensive reworking of the preset sheets?
Autodesk BIM_MGT_101 Summary
- Vendor: Autodesk
- Product: BIM_MGT_101
- Update on: Aug 26, 2026
- Questions: 57

