Implementation-ready documentation must provide both executable specifications and preserved architectural reasoning. Option A supplies the contracts an implementation team needs to build components independently: configuration schemas, accepted inputs, produced outputs, validation requirements, and integration boundaries. These details prevent teams from inventing incompatible assumptions about data structures, tool behavior, error handling, or component ownership.
Option B complements the technical contracts with a decision log. Recording the selected design, underlying constraints, alternatives considered, and reasons for rejection enables implementers to distinguish deliberate architectural decisions from accidental omissions. It also prevents previously rejected approaches from being reintroduced without new evidence.
A high-level business narrative in Option C may explain purpose but cannot direct component-level implementation. Contact information in Option D provides an escalation route, but documentation is not sufficient if routine progress still depends on the architect’s availability. Option E records activity rather than a decision; a model list without the selected model and selection rationale leaves critical cost, latency, capability, and evaluation assumptions unresolved.
A strong handoff package should permit implementation, testing, and support teams to proceed while escalating only genuinely new architectural questions.
Study Guide references/topics: Architecture documentation; interface contracts; configuration schemas; Architecture Decision Records; implementation handoff; decision traceability.
===============