In the application of the benefit/cost method of analysis, what are the criteria for determining...

In the application of the benefit/cost method of analysis, what are the criteria for determining whether a proposed project is acceptable?

A.

B/C is - 1.0

B.

B/C is <1.0

C.

B/C is > minimum ROR

D.

B/C is >1.0