AACE International CCP Question Answer
You are analyzing historic unit costs for 18'' Class 5 reinforced concrete pipe is a database. The unit costs include all costs-material, labor, equipment, and other, for the excavation, bedding, pipe and backfill. Refer to the following table:
What is the median unit cost?
AACE International CCP Summary
- Vendor: AACE International
- Product: CCP
- Update on: Aug 21, 2025
- Questions: 189