New Year Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmasmnth

A plant (facility) has acquired three new screw pumps to replace centrifugal pumps.

A plant (facility) has acquired three new screw pumps to replace centrifugal pumps. Within two months of installation it is found the seals have deteriorated allowing the release of hazardous chemicals into the work place. Which of the following is the best step that the maintenance or reliability leader could have taken to prevent this failure from occurring?

A.

Assured an experienced maintenance representative worked on the design review of the pumps

B.

Participated in the development of manufacturer’s standards for screw pumps and seal designs

C.

Ensured the project provided an enclosure to contain fluids in the event of a seal leak

D.

Reviewed and selected manufacturer’s to bid on the screw pumps based on their past performance

SMRP CMRP Summary

  • Vendor: SMRP
  • Product: CMRP
  • Update on: Dec 21, 2025
  • Questions: 148
Price: $52.5  $149.99
Buy Now CMRP PDF + Testing Engine Pack

Payments We Accept

Your purchase with ExamsVCE is safe and fast. Your products will be available for immediate download after your payment has been received.
The ExamsVCE website is protected by 256-bit SSL from McAfee, the leader in online security.

examsvce payment method