A plant (facility) has acquired three new screw pumps to replace centrifugal pumps. Within two months of installation it is found the seals have deteriorated allowing the release of hazardous chemicals into the work place. Which of the following is the best step that the maintenance or reliability leader could have taken to prevent this failure from occurring?