An agency CM is overseeing the construction of a large, complex multi-story, high security building...

An agency CM is overseeing the construction of a large, complex multi-story, high security building in a remote area. The building had a specialized spire installed at the top, which serves as an encrypted signal transmitter. Construction is complete and the contractor has de-mobilized, but then it is discovered that the signal transmitter is not transmitting the signal. The owner's QC plan required testing for the functionality of the transmitter, but the contractor has not shown test results reflecting adequate performance. Who is responsible for the cost of remobilization?

A.

Designer of record

B.

Agency CM

C.

Contractor

D.

Owner

CMAA Construction-Manager Summary

  • Vendor: CMAA
  • Product: Construction-Manager
  • Update on: Jan 19, 2026
  • Questions: 65
Price: $52.5  $149.99
Buy Now Construction-Manager PDF + Testing Engine Pack

Payments We Accept

Your purchase with ExamsVCE is safe and fast. Your products will be available for immediate download after your payment has been received.
The ExamsVCE website is protected by 256-bit SSL from McAfee, the leader in online security.

examsvce payment method