Halloween Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmasmnth

Your customer's initial use case was Home Directories.

Your customer's initial use case was Home Directories. They implemented the cluster with four 1Gbps ports and LACP. They are planning to expand their cluster to support their core file services. They plan to upgrade their network infrastructure to 10 GbE to facilitate this.

What are two design impacts this change will have?

A.

Maximum performance is obtained by only using a single 10GbE interface per node.LACP and multiple links may be used to increase redundancy, but will not provide more overall performance to the system

B.

LACP and multiple links may be used to increase redundancy, but will not provide more overall performance to the system.FCoE should be considered for the External Network Ports on the nodes.

C.

Dual 10GbE ports on each node will enable throughput of 20Gbps.Only connect half of the nodes to the network.

D.

Maximum performance is obtained by only using a single 10GbE interface per node.Isilon can support up to 400MB/s per node

EMC E20-555 Summary

  • Vendor: EMC
  • Product: E20-555
  • Update on: Oct 20, 2025
  • Questions: 344
Price: $52.5  $149.99
Buy Now E20-555 PDF + Testing Engine Pack

Payments We Accept

Your purchase with ExamsVCE is safe and fast. Your products will be available for immediate download after your payment has been received.
The ExamsVCE website is protected by 256-bit SSL from McAfee, the leader in online security.

examsvce payment method