Summer Special Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: vce65

In the OceanStor VIS6600T dual-redundant switch network environment, using OceanStor Toolkit inspection found that "multi-path...

In the OceanStor VIS6600T dual-redundant switch network environment, using OceanStor Toolkit inspection found that "multi-path state detection "does not pass the inspection report. It is found that there are two routes in the 4 paths of the VIS6600T device's 0 node to each LUN of the array. The path status is disabled. According to the analysis, the switch port connected to port 0 of port A0 of node 0 on node 0 of the VIS6600T is visible on the optical switch. The received optical power is much lower than the rated power of the optical module.

What actions should be taken to fix this?

A.

Replacing the optical module of port 0 in slot A0 of node 0.

B.

Replacing the light of the P0 port in the A0 slot of 0 node.

C.

Replacing the optical module of the port connected to port 0 of the corresponding 0-node A0 slot on the switch.

D.

Reseat the FC interface card corresponding to slot 0 of node A0.

Huawei H13-629_V2.5 Summary

  • Vendor: Huawei
  • Product: H13-629_V2.5
  • Update on: Jul 30, 2025
  • Questions: 0
Price: $52.5  $149.99
Buy Now H13-629_V2.5 PDF + Testing Engine Pack

Payments We Accept

Your purchase with ExamsVCE is safe and fast. Your products will be available for immediate download after your payment has been received.
The ExamsVCE website is protected by 256-bit SSL from McAfee, the leader in online security.

examsvce payment method