Summer Special Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: vce65

Examine the configuration of Core-1 and Core-2.

Examine the configuration of Core-1 and Core-2. AOS-CX switches configured as a VSX stack:

Core1: Interlace lag 256

no shutdown

no routing

vlan trunk allowed all

lacp mode active Interface 1/1/46

no shutdown

lag 256 Interface 1/1/47

no shutdown

lag 256

VSX

Inter-switch-link lag 256

vsx-sync vsx-global

exit

Cofe2: interlace lag 250

no shutdown

no routing

vlan trunk allowed all

lacp mode active

Interlace 1/1/46

no shutdown

lag 256 Interface 1/1/47

no shutdown

lag 256 vsx

inter-switch-link lag 256

exit

When using the "show vsx status" command, the two switches fall to connect and successfully synchronize. What should the administrator do to fix this issue?

A.

Define a larger MTU on the ISL link of the two switches.

B.

Define the VSX roles on the two switches.

C.

Enable active-active forwarding on the two switches.

HP HPE6-A73 Summary

  • Vendor: HP
  • Product: HPE6-A73
  • Update on: Jul 29, 2025
  • Questions: 127
Price: $52.5  $149.99
Buy Now HPE6-A73 PDF + Testing Engine Pack

Payments We Accept

Your purchase with ExamsVCE is safe and fast. Your products will be available for immediate download after your payment has been received.
The ExamsVCE website is protected by 256-bit SSL from McAfee, the leader in online security.

examsvce payment method