HP HPE7-A06 Question Answer
Exhibit.
VSX cluster is already configured. Your task is to validate a correct configuration for the Edge-1 switch that is connected to a CCTV provider that will install its switching infrastructure. The CCTV switches do not support STP.
What needs to be configured on the Edge-1 switch ports connecting to CCTV-SW1 and CCTV-SW2 to prevent loop problems with the existing setup with automatic recovery features?
HP HPE7-A06 Summary
- Vendor: HP
- Product: HPE7-A06
- Update on: Jul 21, 2025
- Questions: 70