What should a designer recommend to BEST save on construction costs in a corporate office...

What should a designer recommend to BEST save on construction costs in a corporate office project with a tight improvement allowance?

A.

Reuse the existing doors and millwork where possible

B.

Save as many existing nonstructural walls as possible

C.

Maintain the existing water closet and lavatory locations

D.

Design an open-plan for each space without suspended ceilings