A hot recovery plan (hot site) is a fully operational, duplicate site that is pre-configured and ready for immediate use in case of a disaster. This approach allows an organization to recover critical operations quickly with minimal downtime.
(A) Cold recovery plan.
Incorrect: A cold site is a facility that has infrastructure but no active IT systems or data until set up after a disaster, resulting in longer recovery times.
(B) Outsourced recovery plan.
Incorrect: Outsourcing recovery refers to third-party disaster recovery services, but does not specifically describe a fully operational duplicate site.
(C) Storage area network recovery plan.
Incorrect: A storage area network (SAN) recovery plan focuses on data storage redundancy, not a fully operational duplicate facility.
(D) Hot recovery plan. (Correct Answer)
A hot site is the fastest and most effective disaster recovery solution, ensuring immediate failover with minimal downtime.
IIA GTAG 10 – Business Continuity Management highlights hot sites as the most effective for mission-critical operations.
IIA GTAG 10 – Business Continuity Management: Recommends hot sites for critical recovery scenarios.
IIA Standard 2120 – Risk Management: Emphasizes preparedness for disaster recovery planning.
Analysis of Each Option:IIA References Supporting the Answer:Thus, the correct answer is (D) Hot recovery plan, as it ensures a fully operational backup site for immediate disaster recovery.