Weekend Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmasmnth

Scenario 7 (continued):Scenario 7: ICure, headquartered in Bratislava, is a medical institution known for its...

Scenario 7 (continued):

Scenario 7: ICure, headquartered in Bratislava, is a medical institution known for its use of the latest technologies in medical practices. It has introduced groundbreaking Al-driven diagnostics and treatment planning tools that have fundamentally transformed patient care.

ICure has integrated a robust artificial intelligence management system AIMS to manage its Al systems effectively. This holistic management framework ensures that ICure's Al applications are not only developed but also deployed and maintained to adhere to the

highest industry standards, thereby enhancing efficiency and reliability.

ICure has initiated a comprehensive auditing process to validate its AIMS's effectiveness in alignment with ISO/IEC 42001. The stage 1 audit involved an on-site evaluation by the audit team. The team evaluated the site-specific conditions, interacted with ICure's personnel,

observed the deployed technologies, and reviewed the operations that support the AIMS. Following these observations, the findings were documented and communicated to ICure. setting the stage for subsequent actions.

Unforeseen delays and resource allocation issues introduced a significant gap between the completion of stage 1 and the onset of stage 2 audits. This interval, while unplanned, provided an opportunity for reflection and preparation for upcoming challenges.

After four months, the audit team initiated the stage 2 audit. They evaluated AIMS's compliance with ISO/IEC 42001 requirements, paying special attention to the complexity of processes and their documentation. It was during this phase that a critical observation was made:

ICure had not fully considered the complexity of its processes and their interactions when determining the extent of documented information. Essential processes related to Al model training, validation, and deployment were not documented accurately, hindering effective control and management of these critical activities. This issue was recorded as a minor nonconformity, signaling a need for enhanced control and management of these vital activities.

Simultaneously, the auditor evaluated the appropriateness and effectiveness of the "AIMS Insight Strategy," a procedure developed by

ICure to determine the AIMS internal and external challenges. This examination identified specific areas for improvement, particularly in

the way stakeholder input was integrated into the system. It highlighted how this could significantly enhance the contribution of relevant

parties in strengthening the system's resilience and effectiveness.

The audit team determined the audit findings by taking into consideration the requirements of ICure, the previous audit records and

conclusions, the accuracy, sufficiency, and appropriateness of evidence, the extent to which planned audit activities are realized and

planned results achieved, the sample size, and the categorization of the audit findings. The audit team decided to first record all the

requirements met; then they proceeded to record the nonconformities.

Based on the scenario above, answer the following question:

Question:

Based on Scenario 7, for which of the following ISO/IEC 42001 clauses was the minor nonconformity issued?

A.

Clause 7.3 Awareness

B.

Clause 7.4 Communication

C.

Clause 7.5 Documented information

PECB ISO-IEC-42001-Lead-Auditor Summary

  • Vendor: PECB
  • Product: ISO-IEC-42001-Lead-Auditor
  • Update on: Jul 22, 2025
  • Questions: 198
Price: $52.5  $149.99
Buy Now ISO-IEC-42001-Lead-Auditor PDF + Testing Engine Pack

Payments We Accept

Your purchase with ExamsVCE is safe and fast. Your products will be available for immediate download after your payment has been received.
The ExamsVCE website is protected by 256-bit SSL from McAfee, the leader in online security.

examsvce payment method