CIPS L4M2 Question Answer
A procurement manager decided to use a conformance specification in a request for quotation (RFQ) for the manufacturing of a specialist item designed by their company. The company does not have the capability to manufacture the item in-house, but requires the item to be made to their detailed specification. Was this the correct thing to do?
CIPS L4M2 Summary
- Vendor: CIPS
- Product: L4M2
- Update on: Dec 9, 2025
- Questions: 303

