USGBC LEED-AP-BD+C Question Answer
A newly constructed school has installed solar thermal systems and wind turbines on site. To achieve the maximum number of Energy and Atmosphere points, which team members must be included?
USGBC LEED-AP-BD+C Summary
- Vendor: USGBC
- Product: LEED-AP-BD+C
- Update on: Aug 2, 2025
- Questions: 337