USGBC LEED-AP-ID+C Question Answer
Based on the results of a six-hour waste stream study, the team for an Interior Design and Construction Retail project plans to provide dedicated areas for four recyclable waste streams: cardboard, plastic, metal, and paper.
The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team's top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite, Storage and Collection of Recyclables?
USGBC LEED-AP-ID+C Summary
- Vendor: USGBC
- Product: LEED-AP-ID+C
- Update on: Jan 2, 2026
- Questions: 100

