Pre-Summer Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmasmnth

A network administrator installs a node that requires a media converter to connect Ethernet to...

A network administrator installs a node that requires a media converter to connect Ethernet to fiber but sees no link light on the node. The administrator notices the following:

    Both terminating points are properly seated.

    Both the fiber and Ethernet cables have been successfully tested.

    The media converter is turned on.

    The switchport is configured as half duplex.

Which of the following is the reason the link light is not on?

A.

The TX/RX connection is transposed.

B.

The switchport is misconfigured.

C.

One of the cables has a short.

D.

The switchport interface has errors.

CompTIA N10-009 Summary

  • Vendor: CompTIA
  • Product: N10-009
  • Update on: May 14, 2026
  • Questions: 550
Price: $52.5  $149.99
Buy Now N10-009 PDF + Testing Engine Pack

Payments We Accept

Your purchase with ExamsVCE is safe and fast. Your products will be available for immediate download after your payment has been received.
The ExamsVCE website is protected by 256-bit SSL from McAfee, the leader in online security.

examsvce payment method