Summer Special Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: vce65

Refer to the exhibit.

Refer to the exhibit.

A Nutanix host is connected as shown in the exhibit with br0-up set to active/backup. Physical Switch 1 experiences a power outage causing br0-up to failover to using eth2. The CVM and host become inaccessible. User VMs restart on other hosts in the cluster, which causes a disruption to those VMs.

Which configuration issue likely caused this outage?

A.

Bridge br0-up should be configured to use balance-tcp rather than active/backup.

B.

The CVM should have eth1 connected to the OVS.

C.

The upstream port for eth2 is missing a VLAN.

D.

The user VMs only have one NIC

Nutanix NCM-MCI-5.15 Summary

  • Vendor: Nutanix
  • Product: NCM-MCI-5.15
  • Update on: Jul 29, 2025
  • Questions: 107
Price: $52.5  $149.99
Buy Now NCM-MCI-5.15 PDF + Testing Engine Pack

Payments We Accept

Your purchase with ExamsVCE is safe and fast. Your products will be available for immediate download after your payment has been received.
The ExamsVCE website is protected by 256-bit SSL from McAfee, the leader in online security.

examsvce payment method