Nutanix NCM-MCI-5.20 Question Answer
A system administrator needs to shut down an AHV node in a Nutanix cluster without causing service disruption. The administrator checks data resiliency and verifies that the cluster can tolerate a node down.
Which three steps should the administrator perform next? (Choose three.)
Nutanix NCM-MCI-5.20 Summary
- Vendor: Nutanix
- Product: NCM-MCI-5.20
- Update on: Jul 19, 2025
- Questions: 167