Summer Special Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: vce65

Refer to the exhibit.

Refer to the exhibit.

On a four-node NX-3460 cluster, two 10G NiCs are connected to redundant Cisco ToR 5K switches as shown in the first exhibit Port On a four-node NX-3460 cluster, two 10G NICs are connected to redundant Cisco TOR Sk switches as shown in the fist exthibt. Port failover must be tested.

The network configuration output from the CVM is shown in the second exhibit. To test fallover, a shut command is executed on the switchport that connects the node to the 5k1 switch.

Refer to the exhibit.

A.

Active link is disconnected. Passive link takes over.

B.

Passive link is disconnected. Active link takes over.

C.

Active link takes over. HA Failover takes place.

D.

Passive link takes over. HA Failover takes place.

Nutanix NCS-Core Summary

  • Vendor: Nutanix
  • Product: NCS-Core
  • Update on: Jul 30, 2025
  • Questions: 309
Price: $52.5  $149.99
Buy Now NCS-Core PDF + Testing Engine Pack

Payments We Accept

Your purchase with ExamsVCE is safe and fast. Your products will be available for immediate download after your payment has been received.
The ExamsVCE website is protected by 256-bit SSL from McAfee, the leader in online security.

examsvce payment method