Winter Special Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: vce65

You are preparing to add a 2-node AFF A250 system to an existing 4-node AFF...

You are preparing to add a 2-node AFF A250 system to an existing 4-node AFF A800 cluster with Cisco Nexus 3232C switches. The cluster switches are currently running the Cluster-HA RCF.

In this scenario, which two steps are required to install the AFF A250 system? (Choose two.)

A.

Load the Storage RCF

B.

Cable the AFF A250 nodes to the breakout ports on the switch.

C.

Cable the AFF A250 nodes to the next free ports on the switch.

D.

Load the Cluster-HA-Breakout RCF

Netapp NS0-185 Summary

  • Vendor: Netapp
  • Product: NS0-185
  • Update on: Feb 3, 2026
  • Questions: 120
Price: $52.5  $149.99
Buy Now NS0-185 PDF + Testing Engine Pack

Payments We Accept

Your purchase with ExamsVCE is safe and fast. Your products will be available for immediate download after your payment has been received.
The ExamsVCE website is protected by 256-bit SSL from McAfee, the leader in online security.

examsvce payment method