Choose the correct answer.
An engineering learn has been charged to design and build an embedded real-time control system using COTS (Commercial Off-The-Shelf) purchased components where possible A technical risk for such a control system is that the system will miss (i.e . fail to respond to) critical inputs The project has the additional risk that there may not be any components on the market that will meet both timing and cost constraints
Given this, what information must be in the model before the engineering team can begin selecting and procuring COTS components?