PMI PMP Question Answer
A project manager is working in a regulated industry. The minimum viable product (MVP) for the launch has been defined. The project manager learns that the regulatory body requires a prototype for inspection before the product can be launched; however, the prototype is not part of the MVP definition.
What should the project manager do next?
PMI PMP Summary
- Vendor: PMI
- Product: PMP
- Update on: Oct 19, 2025
- Questions: 594