According to the NEC, if the PV system disconnect and the building service disconnect are...

According to the NEC, if the PV system disconnect and the building service disconnect are at different locations, there MUST be a/an:

A.

Interface that shuts down the PV system if the utility connection is lost.

B.

Permanent plaque or directory that indicates the locations of both disconnects.

C.

Means of locking out both disconnects when the PV system inverter is being serviced.

D.

Permanent plaque or directory that indicates the location of the PV utility connection.

NABCEP PVIP Summary

  • Vendor: NABCEP
  • Product: PVIP
  • Update on: Oct 16, 2025
  • Questions: 160
Price: $52.5  $149.99
Buy Now PVIP PDF + Testing Engine Pack

Payments We Accept

Your purchase with ExamsVCE is safe and fast. Your products will be available for immediate download after your payment has been received.
The ExamsVCE website is protected by 256-bit SSL from McAfee, the leader in online security.

examsvce payment method