UiPath UiPath-ADPv1 Question Answer
"Process A" is scheduled to run at 2:00 PM using a time trigger with the Schedule ending of Job execution feature configured to stop the job after 20 minutes. Assuming that the robots are busy and "Process A" is queued until 2:05 PM. at what time will "Process A* be stopped?
UiPath UiPath-ADPv1 Summary
- Vendor: UiPath
- Product: UiPath-ADPv1
- Update on: Aug 2, 2025
- Questions: 204