A process calls for the addition of a reactant over a certain period of time. The flow controller on the reactant’s feed line was out of calibration and reduced the flow rate of the reactant. The operator noticed the addition rate was too low and, contrary to the operating procedures, he opened a bypass valve around the flow control valve to increase the flow rate. As a result, the operator added the remaining reactant too quickly, and a runaway reaction occurred. Weaknesses in which of the following Risk Based Process Safety elements could have contributed to the cause of this incident? (Select all that apply)