When a public works project utilizes design-bid-build, which option would NOT minimize the risk of...

When a public works project utilizes design-bid-build, which option would NOT minimize the risk of bid shopping?

A.

The architect/engineer/owner team can consider bid listing and bid depository provisions.

B.

Require bidders to provide a list of their intended subcontractors along with their bid.

C.

The subcontractor can withhold their prices from the bidder until the final moments before the deadline.

D.

The bidder can ask the subcontractor to reevaluate their prices to find a lower price after the subcontractor has submitted their price.

Construction Specifications Institute CDT Summary

  • Vendor: Construction Specifications Institute
  • Product: CDT
  • Update on: Jan 10, 2026
  • Questions: 120
Price: $52.5  $149.99
Buy Now CDT PDF + Testing Engine Pack

Payments We Accept

Your purchase with ExamsVCE is safe and fast. Your products will be available for immediate download after your payment has been received.
The ExamsVCE website is protected by 256-bit SSL from McAfee, the leader in online security.

examsvce payment method