A LEED AP performs several on-site reviews for LEED compliance and encounters the followingscenarios.

A LEED AP performs several on-site reviews for LEED compliance and encounters the followingscenarios. Which scenario requires the installation of additional meters to comply with Energy and Atmosphere Prerequisite, Building-Level Energy Metering?

A.

A school whose electricity usage is being measured and invoiced by the local electrical utility

B.

A building plus its addition whose electricity and natural gas usage is being measured by the original building's meters

C.

A data center that receives electricity from a campus plant and whose meters are located at the electrical service entrances

D.

A building that shares its chilled water usage with other buildings on a campus and whose chilled water consumption is measured at the campus level

USGBC LEED-AP-O+M Summary

  • Vendor: USGBC
  • Product: LEED-AP-O+M
  • Update on: Feb 7, 2026
  • Questions: 166
Price: $52.5  $149.99
Buy Now LEED-AP-O+M PDF + Testing Engine Pack

Payments We Accept

Your purchase with ExamsVCE is safe and fast. Your products will be available for immediate download after your payment has been received.
The ExamsVCE website is protected by 256-bit SSL from McAfee, the leader in online security.

examsvce payment method