A project owner has hired a Commissioning Authority (CxA) to develop a Commissioning (Cx) Plan which will be
submitted in the LEED application to document Energy and Atmosphere Credit, Existing Building Commissioning -
Analysis, Option 1. Existing Building Commissioning. At a minimum, what should be included in the Cx Plan?